 |
Stockade Fence installation - 1984
1984: Stockade Fence Installation
East Northport, NY
- Stage 1 - Property Plan and site survey.
- Stage 2 - Site preparation to include renovation of fence line and removal of: old shrubs, roots, stumps and grass with bobcat. All original debris was hauled to land fill and discarded.
- Stage 3 - Installation of Stockade Fence which was grade 1A spruce. All timbers used were; 30 year cca, grade 1, pressure treated lumber.
|
|