 |
New Sod Lawn
1981: New Sod Lawn
Commack, New York 11725
ITEM- NLP - 04
- Stage 1 - Property Plan and site survey.
- Stage 2 - Site preparation to include removal of over grown shrub, bush, trees and old lawn. All original debris was hauled to land fill and discarded.
- Stage 3 - Excavation and grading with Bobcat.
- Stage 4 - Chemical preparation; lime, fertilizer and insecticide.
- Stage 5 - Installation of sod and soil.
|
|